Category: Projects

Plowing Falls Road Randle

We are re-placing 7000 feet of 15 KVA cable for Lewis County PUD on Falls Rd. in Randle, WA. Plowing operation at 48″ cover, 2 segments, 280 feet of boring under stumps, county road and down hill to Falls Dam.. Start date 2/21/16 complete date 2/25/16.

Seabrook Sewer Installation

  This project expands the existing 4″pressure main to 8″ along SR109 on the Washington Coast. The owner, Parametrix Engineers and WSDOT decided that directional drilling was the best value for the project with consideration for traffic, existing utilities and enviromental impacts. Wiseman Utilities worked with all parties to accomplish the design based on the […]

Industrial Park at TransAlta Phase 1 Infrastructure

Wisemas was awarded this project in which we will be installing utility infrastructure including: 2130 feet of 3inch HDPE sewer force main 250 feet 4 inch HDPE potable water line 1325 feet 12 inch HDPE raw water line All associated manhole, vaults, valves and fittings Electrical controls  

Lewis County PUD Power Upgrade

Wiseman is plowing and drilling 15,700 feet of 2 inch pipe for 3 phase 15kva power upgrade on Crego Hill Rd.

City of Tumwater Fiber Link

Wiseman is boring (2) 4″ HDPE pipes under I-5 at milepost 102 to complete the fiber link for the City of Tumwater

Lakota Beach Sewer

The challenge of this project was to install a low pressure sewer main in an environmentally and culturally sensitive area near Puget Sound. Wiseman crews successfully installed a low pressure sewer main with service connections using directional drilling method.  

N. East Lake Sewer

Directional drilled 4,400 ft of 4″ HDPE  low pressure sewer main with 29 side connections and 3 clean-outs in Federal Way, WA along right-of-ways.

Seattle's Arboretum Park Water Main

Installed new 10″ – 8″ – 6″ main lines using directional drilling for minimal impact to the Arboretum’s naturally landscaped grounds with heavy tourist traffic.

Capitol Campus Irrigation Line Replacement

We were contracted by Washington General Administrations Services to replace irrigation lines.  We bored 2 & 6″ water mains under the Capitol Campus preserving the extensive landscaping and historically sensitive areas.  

Martin Way AC Water Main

We installed an 8″ AC main replacement along a commercial corridor for The City of Olympia.  This project included boring 3200 feet of Certainteed pipe, 6 hydrants and 8 services.  This project also required night-time cut over from existing. “Certainteed Certa-Lok C900RJ Installation Video of Wiseman Utilities Crew at work. Best Installation crew I’ve seen […]