Seabrook Sewer Installation

 

Seabrook Bore

This project expands the existing 4″pressure main to 8″ along SR109 on the Washington Coast. The owner, Parametrix Engineers and WSDOT decided that directional drilling was the best value for the project with consideration for traffic, existing utilities and enviromental impacts. Wiseman Utilities worked with all parties to accomplish the design based on the alignment and profile needed. The project total length is 2000 feet. It will be accomplished with two drill lengths of 1000ft.