Industrial Park at TransAlta Phase 1 Infrastructure

Wisemas was awarded this project in which we will be installing utility infrastructure including:

  • 2130 feet of 3inch HDPE sewer force main
  • 250 feet 4 inch HDPE potable water line
  • 1325 feet 12 inch HDPE raw water line
  • All associated manhole, vaults, valves and fittings
  • Electrical controls

 

Leave a Reply

Your email address will not be published. Required fields are marked *

*

What is 10 + 8 ?
Please leave these two fields as-is:
IMPORTANT! To be able to proceed, you need to solve the following simple math (so we know that you are a human) :-)